Technical review
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
Our role can start with a developed design or an open brief. In both cases, we identify the technical questions, document the agreed answer and coordinate manufacture with the programme.
Send us the available documentation, location, units and target date
The scope can begin with a defined design or with a still open need. We confirm what documentation exists and what decisions are missing before manufacturing
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
We adjust construction solutions, thicknesses, machining and hardware to the intended use
Manufacturing according to documentation and finishes validated before starting
We plan delivery, access, fitting, adjustments and review of installed parts
The dialogue, level of detail and planning change depending on who coordinates the work and how the furniture must be delivered.
We turn the design intent into a solution that can be measured, manufactured and installed to the agreed detail
We integrate the custom carpentry into the renovation schedule and review the conditions before fitting
We organize typologies, units and phases to be able to value the furniture with a comparable and documented scope
We assess furniture projects for rooms and common areas based on frequent use, cleaning and maintenance.
We study commercial furniture that combines display, storage, brand image and real conditions of the premises
We propose solutions for homes intended for sale or rent according to the typology, use and planned investment.
Tell us who coordinates the work, what furniture you need and what documentation exists. We will review the case by scope, not by label
Each milestone reduces uncertainty and leaves a record of what is manufactured, how it is finished and under what conditions it is installed.
Plans, measurements, units, finishes, location and planned schedule
Technical queries, exclusions, alternatives and outstanding information
Final measurements, samples, hardware, details and fitting conditions
Manufacture, control, delivery, installation and agreed adjustments
It is not necessary for all documentation to be closed. We review what is available and point out exactly what information is missing to continue
What parts should be manufactured and if there are repeated typologies
Plan, elevations, details or approximate dimensions for a first review
Prescribed finishes or visual references to propose a viable equivalence
town or area, access routes, phase of work and target installation date
The final scope is confirmed after reviewing the documentation and actual project conditions
Yes. We review the documentation, detect manufacturing doubts and confirm details, materials, fittings, measurement and fitting before assessing the final scope
Yes, as long as it is defined what part of the development we assume. We can propose constructive solutions and materials compatible with the use and the planned investment.
Yes. We need to know typologies, quantities, location, delivery sequence, storage and installation conditions
Measurements, configuration, materials, finishes, fittings, relevant junctions, economic scope and transport and installation conditions
Local knowledge helps with logistics, but the room still decides the design. We treat the address in Castellón de la Plana as the start of an investigation, never as a shortcut to a standard answer.
Start with current drawings, finish intent, programme dates and known access constraints. We are listening for the information already resolved, the decisions still open and the point at which the site will be ready. A polished specification can come later; at this stage, a candid description is usually more useful.
Reference images help us read taste, not copy dimensions. We mark what you like about them—perhaps the calm fronts, open display or timber tone—and test only that idea against the room.
Approximate measurements help us judge scale. Production dimensions are different: they are taken at the points that control doors, fillers, worktops, services and the route into the room.
The survey is not a theatre of laser lines. Its value is the record that links a real wall to a specific drawing decision.
Two materials can look similar on a screen and behave very differently in daily use. We discuss that gap plainly, especially where fingerprints, water, heat or frequent opening matter.
Interiors deserve the same thought as fronts. Shelf spans, drawer bottoms, ventilation and edge quality influence how the furniture feels long after installation day.
A beautiful elevation is not enough if it cannot enter the building or be adjusted safely. The fitting sequence is considered while the drawings can still respond.
When installation overlaps with renovation work, the sequence matters. Floors, paint, electrical work and furniture each need a clear point at which the next trade can proceed.
A price range is most helpful when it points to a realistic construction level. The final quotation then records the approved materials, hardware, delivery and fitting rather than relying on verbal assumptions.
A written exclusion is as useful as an inclusion. It prevents assumptions about electrical work, decoration, appliances or removal of existing furniture.
You will not be asked to approve everything at once. Layout comes before minor details; verified dimensions come before production; fitting arrangements are settled before delivery.
A good first reply may be short: yes, this is feasible; no, that arrangement will cause a problem; or here is the one photograph we still need.
Share plans, units, location and target date. We will tell you the next step